Olympic Aquatic Center and A1 Crossing

During the Olympic and Paralympic Games, the Aquatic center will host diving, waterpolo and artistic swimming competitions.
After the Games, the Olympic Aquatic center will be reconfigured into an aquatic complex offering swimming lessons, especially for local schoolchildren, the installation of the French Diving Center, the reception of the general public and the organization of major events such as championships.

The A1 crossing will link the Stade de France to the east to the Olympic Aquatic Complex to the west.
This crossing, dedicated to pedestrians and cyclists only, will be landscaped.
 

Schedule:

February 2020: signing of the concession contract

April 2021: start of works

April 2024: handover to Paris 2024

Mid 2025: delivery of the legacy configuration

 

Contracting authority: Greater Paris Metropolis (MGP)